Incident SOPs
The core actions a controller works through for each incident type, with the notes, flowcharts and forms behind them. Pick a SOP below, search any wording, or press Ctrl K.
1ADD ActivationADD (Automatic Dropping Device) ActivationADD15 actions2De-WirementDe-WirementDWM11 actions3Object on OHLObject on the OHLOHL10 actions4Bridge StrikesBridge StrikesBST24 actions5Broken RailBroken RailBKR11 actions6Track DefectTrack Defect (Rough Ride Reports)TD10 actions7Suspected Track DefectSuspected Track Defect Reported by a Person Other Than TraincrewSTD9 actions8Train Crew STDTraincrew Reported Suspected Track DefectTCR9 actions9DerailmentDerailmentDRM18 actions10Signals Difficult to SeeSignal Difficult to See Due to VegetationSOV28 actions11CAT A SPADCategory 'A' SPADCAS15 actions12Change of AspectChange of AspectCOA12 actions13CollisionsCollisionsCOL17 actions14AnimalsAnimals on the LineAOL8 actions15ObstructionObstruction on the LineOOL12 actions16DGIDangerous Goods Incident (DGI)DGI21 actions17HABD ActivationHot Axle Box (HABD) ActivationHAB8 actions18WILD ActivationWheel Impact Load Detector (WILD / GOTCHA) ActivationWLD9 actions19ESR ImposedESR ImposedESR8 actions20CRT ESRCRT ESR ImposedCRT ESR11 actions21CAT BSRCAT BSRCAT BSR12 actions22TrespassTrespassTRP15 actions23Emergency ServicesEmergency Services on the RailwayEMR15 actions24Failed FreightFailed Train (Non-Passenger)FTNP14 actions25Failed & Stranded TrainFailed & Stranded TrainFST14 actions26Adverse WeatherAdverse Weather Action PlanAWAP6 actions27FloodingFloodingFLD7 actions28Axle CountersInfrastructure Failure – Axle CountersISF(AX)11 actions29Points FailureInfrastructure Failure – PointsISF(P)10 actions30Infrastructure FailureInfrastructure Failure – Track Circuits / SignalsISF(TC)10 actions31Staff AccidentsStaff Accidents / AssaultsSTA10 actions32Near MissNear MissNRM15 actions33Person StruckPerson Struck by TrainPST18 actions34Possession IrregularityPossession IrregularityPSI16 actions35Possession OverrunPossession OverrunPSO13 actions36SpillagesSpillagesSPL15 actions37Helpline & Other CallsHelpline & Other CallsHLP14 actions38AWSAWS FaultsAWS15 actions39TPWS OSSTPWS Overspeed at Signal / PSRTPWS12 actions40650V Power Failure650V Signalling Power Failure65011 actions41Level CrossingLevel Crossing IncidentsLCI12 actions42UWC (SB Closed)Authorising a UWC Request (Signal Box Closed)UWX18 actions43Newark Castle LXNewark Castle Level Crossing Failed DownNC6 actions44Autumn WSTCFAutumn – WSTCF (Wrong Side Track Circuit Failure)WSTCF11 actions45ROLAAutumn – ROLA (Report of Low Adhesion)ROLA7 actions46FireFire Involving Acetylene CylindersFIRE10 actions47SCADA FailureSCADA FailureSCD10 actions
Recently updated
- 1. ADD (Automatic Dropping Device) Activation11 Oct 2026 · workbook import
- 2. De-Wirement11 Oct 2026 · workbook import
- 3. Object on the OHL11 Oct 2026 · workbook import
- 4. Bridge Strikes11 Oct 2026 · workbook import
- 5. Broken Rail11 Oct 2026 · workbook import