Autumn – ROLA (Report of Low Adhesion)
0 of 7 core actions ticked· ticks are kept in this tab only
Controller to ensure the following core actions have been completed:
1
Identify unit / headcode involved and line affected
2
Is the site a known area of Low adhesion published in the sectional appendix
3
No: Ensure Signaller complete Section 1 and 2 ROLA form
4
Yes: but worse than expected -Ensure Signaller complete Section 1 and 2 ROLA form
5
Arrange response staff to visit site, inspect and clean as appropriate
6
Yes: As expected - Normal working applies
7
When the portion of the line has been inspected/or 30 mins following the initial report. Arrange for a controlled Test stop to be conducted