Obstruction on the Line
0 of 12 core actions ticked· ticks are kept in this tab only
Controller to ensure the following core actions have been completed:
1
Who is reporting? Train/person
2
Location/line of the object (try an be precise as possible)
3
What is the object? Can it be safely removed by the reportee?
4
Is it a danger to trains or people?
5
Instigate safety of the line (If required)
6
Can photos be provided/forward to Derby control
7
Arrange response MOM/Pway and ETAs
8
Advise TOC/FOC
9
Advise BTP if required (reference number)
10
RCM/IC listen to driver GSMR report
11
Create FMS and arrange for a fencing inspection
12
Update CCIL/FMS and send a Tyrell message and WhatsApp